On 11/18/2023 and 11/19/2023 divers were onsite at West Lake. By the end of the day on the 19th, the reconfigured intake extension was successfully installed and water works crews tested pulling water from that lower intake. Due to low lake levels, Water Works staff will begin
Click for More Osceola, Iowa News →Below is a schedule of activities pertaining to raising the lower intake: Nov 4 – 5 Dive team was onsite to install components to raise the lower intake 4 feet. A large rock located in the intake area created challenges for the divers to effectively raise the
Click for More Osceola, Iowa News →